ADCOP – Techno Engineering.

Project description

The cable crane for this project was installed in a desert like area for the construction of a desert-pipeline. The climatic conditions were challenging, as we had temperatures up to 52°C during the installation of the cable crane.

Scope of work

Installation of cable cranes and operation, transport of pipes and fitting into welding position, transport of Sandbags, blasting and coating material, padding and backfilling material.

Project Info

Customer: Techno Engineering Services P.V.T LTD
Project Owner: IPIC
Location: United Arabian Emirates
Date: 2010

Technical details

Number of installations: 1
Length: 2.640 m
Difference in altitude: 598 m
Towers: 7
Payload: 20 to
Loads: Pipes, Construction material, fuel, construction equipment, machinery
Duration of the project: 6 months
Size of the pipes: 48” / ca. 122 cm
Slope: bis zu 56°
Machinery in usage:  GANTNER GC 200, electro-hydraulic cableway drive designed and constructed by GANTNER

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects