Bear Creek Hydro.

Project description

The Bear Creek Hydro project was LCS Cable Cranes first installation in Canada, where safety and environmental standards and requirements are high. The cable crane for the hydro-power-plant in Bear Creek included limited manpower transportation.

Scope of work

Cable Crane for penstock construction, limited manpower transportation.

Project Info

Customer: TRP Contractors LP
Project Owner: Regional Power
Location: British Columbia, Canada
Date: 2010 – 2012

Technical details

Total length: 1,400 m
Towers: 5
Payload: 16 to
Total volume: construction material, 1.000 m pipe, concrete, installation Equipment, limited manpower transport
Manpower Transport: licensed under BCSA Regulation for construction purposes
Duration of project: 16 months
Size of pipe: 36” / approx. 91.5 cm
Slope: up to 41°
Machinery in usage: 1 carriage SF100, 1 carriage GANTNER GC 50, 1 winch GANTNER GW 500 D

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects