Baku–Tbilisi–Ceyhan pipeline project.

Project description
A pipeline project of LCS Cable Cranes in Turkey. We installed a cable crane for the transport of all necessary materials and Equipment for the laying of a pipeline in difficult terrain.
Scope of work
Installation of cable cranes and operation, transport of pipes and fitting into welding position, transport of Sandbags, blasting and coating material, padding and backfilling material
Project Info
Customer: Tepe – Nacap
Project owner: BP / SOCAR
Location: Turkey
Date: 2004
Technical details
Total length: 1.200 m
Towers: 5
Payload: 8.5 to
Loads: 1.200 m pipes, 3.000 mt sand for padding and backfilling
Duration of project: 4 months
Size of pipes: 42” / approx. 107 cm
Slope: up to 37 °
Used machinery: 2 carriages SFM 30/60, 1 winch GANTNER HSW 130