Baku–Tbilisi–Ceyhan pipeline project.

Project description

A pipeline project of LCS Cable Cranes in Turkey. We installed a cable crane for the transport of all necessary materials and Equipment for the laying of a pipeline in difficult terrain.

Scope of work

Installation of cable cranes and operation, transport of pipes and fitting into welding position, transport of Sandbags, blasting and coating material, padding and backfilling material

Project Info

Customer: Tepe – Nacap
Project owner: BP / SOCAR
Location: Turkey
Date: 2004

Technical details

Total length: 1.200 m
Towers: 5
Payload: 8.5 to
Loads: 1.200 m pipes, 3.000 mt sand for padding and backfilling
Duration of project: 4 months
Size of pipes: 42” / approx. 107 cm
Slope: up to 37 °
Used machinery: 2 carriages SFM 30/60, 1 winch GANTNER HSW 130

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects