HE Lesce Dam Project.

Project description

The HE Lesce Project was an interesting project due to the complex installation of a parallel crane for a dam construction, where two big crane towers need to move simultaneously. The cable crane – active 24 hours a day – was the “heart of the construction site“, as all material were positioned with the parallel crane.

Scope of work

Transport of concrete and construction material as well as all necessary construction machinery for the dam construction.

Project Info

Customer: KONSTRUKTOR SPLIT
Location: Croatia
Date: 2006-2008

Technical details

Total length: 270 m
Lifting height: 70 m
Towers: 2 (sideways manoeuverable) – parallel crane
Payload: 9 to
Total volume: >45,000 to concrete, plus reinforcement and concrete forms
Duration of project: 24 months
Machinery in usage: 1 carriage GANTNER mech. CC09, 1 winch GANTNER CC09E

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects