Hydro-power-plant Limberg II.

Project description

The by LCS installed cable crane for a construction in the mountains in Austria. The cableway-system needed to be operative 24 hours operation per day.- was the only access to the construction site at the “Wasserschloss-Oberkammer” at over 2,000 m sea level.

Scope of work

Transport of concrete and construction material as well as all necessary construction machinery and passenger transportation.

Project Info

Customer: Arge Limberg II
Project owner: Verbund
Location: Austria
Date: 2007

Technical details

Total length: 1,200 m
Towers: 2
Payload: 12 to
Total volume: > 4,000 to construction material and Equipment
Duration of project: 24 months
Slope: up to 35°
Machinery in usage: 1 carriage GANTNER GC 160, 1 winch GANTNER GW 500 E

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects