Hydro-Power plant Linthal 2015.

Project description

The installation of the cable crane system was complex due to the difficult accessibility. All materials needed to be brought through a tunnel to the construction site, furthermore the Project was marked by a short timing. Finally the cableway by LCS Cable Cranes, operative 24 hours a day, contributed significantly to the construction of the hydro power electric plant being the transport solution for heavy loads. The hydro-power-plant should start to be operative in 2015.

Scope of work

Material ropeway for the transport of concrete and construction material as well as steel construction of towers

Project Info

Customer: STRABAG
Project owner: AXPO
Location: Switzerland
Date: 2008-2009

Technical details

Total length: 2,200 m
Towers: 8
Payload: 7 to
Total volume: construction equipment, 3000 m³ concrete; 2,700 tons construction material, construction equipment
Duration of project: 12 months
Slope: up to 34°
Machinery in usage: 2 carriages SFM 30/60, 1 winch GANTNER GW 500 D

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects