Martirano – Morano Calabro.

Pipelinebau

Project description

The project was executed in Southern Italy. The difficulty was a parallel to the cable crane track running gas Pipeline – that must be taken in consideration during the whole Installation of the cable crane.

Scope of work

Installation of cable cranes and operation, transport of pipes and fitting into welding position, transport of Sandbags, blasting and coating material, padding and backfilling material.

Project Info

Customer: SICIM
Project owner: Snam Rete Gas S.p.A.
Location: Italy
Date: 2008

Technical details

Total length: 900 m
Towers: 3
Payload: 12 to
Total volume: 900 m pipes, concrete 6.000 m3 padding material
Size of pipes: 48” / approx. 122 cm
Slope: up to 41°
Duration of project: 3 months
Machinery in usage: 1 carriage GANTNER GC 160, 1 winch GW500 D

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects