Martirano – Morano Calabro.

Project description
The project was executed in Southern Italy. The difficulty was a parallel to the cable crane track running gas Pipeline – that must be taken in consideration during the whole Installation of the cable crane.
Scope of work
Installation of cable cranes and operation, transport of pipes and fitting into welding position, transport of Sandbags, blasting and coating material, padding and backfilling material.
Project Info
Customer: SICIM
Project owner: Snam Rete Gas S.p.A.
Location: Italy
Date: 2008
Technical details
Total length: 900 m
Towers: 3
Payload: 12 to
Total volume: 900 m pipes, concrete 6.000 m3 padding material
Size of pipes: 48” / approx. 122 cm
Slope: up to 41°
Duration of project: 3 months
Machinery in usage: 1 carriage GANTNER GC 160, 1 winch GW500 D