OCP Ecuador Project.

Project description

This project was a challenge especially regarding the environmental obligation and conditions. On the one hand, the construction site was in the middle of the cloud forest in Ecuador, where the climatic conditions were not favorable for a normal construction site; on the other hand, we were in a protective area in Ecuador, and had high environmental obligations – for example the noise limit was very very low.

Scope of work

Installation of cable cranes and operation, transport of pipes and fitting into welding position, transport of Sandbags, blasting and coating material, padding and backfilling material, drilling and anchoring of pipeline.

Project Info

Customer: Techint Argentina
Project Owner: OCPEcuador
Location: Ecuador
Date: 2001 – 2003

Technical details

Number of cranes: 11
Total length: 11.000 m
Towers: 128
Payload: 4 to
Loads: 6.500 m pipes, 150.000 to sand and concrete, construction material
Duration of project: 24 months
Size of pipe: 28” / approx. 71 cm
Slope: Up to 60°
Used machinery: 11 carriages SF 30/60, 3 winches GANTNER HSW 130, 1 winch GANTNER HSW 80, 5 winches W30, 2 winches W90

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects