Parques de Sintra.

Project description

The project in Portugal had a special character, as many exigencies needed to be considered. The cable crane was installed for the restoration of the Moorish castle in Sintra. As the castle is located in a highly touristic national park, several topics needed to be considered – among others, the whole installation of the cableway needed to be low-noisy and the track of the cable crane had to be above the trees due to environmental determinations in the national park.

Scope of work

Delivery and installation of a complete cable crane systems for the restoration projects in the Moorish castle in Sintra.

Project Info

Customer: Parques de Sintra – Monte da Lua, S.A.
Location: Portugal
Date: 2011

Technical details

Total length: 250m
Towers: 1
Payload: 2 mt
Loads: construction material and equipment
Slope: up to 25°
Used machinery: 1 carriage GANTNER BK 25, 1 winch GANTNER HSW 40

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects