Project description
The climatic conditions during the Rio Wele project in Equatorial Guiniea were challenging – the extremely high air humidity during the installation of the cable crane made it being a hard work for our Team which installed the cable crane during the rain the rain period.
Scope of work
Cable crane for Highway Bridge; transport of concrete and construction material as well as all necessary construction machinery.
Project Info
Customer: Besix G.E.
Project Owner: Government of Equatorial Guinea
Location: Equatorial Guinea
Date: 2011-2012
Technical details
Number of cranes: 1 span with 300 m
Total length: : 1 span with 300 m
Towers: 2
Payload: 9 to
Transported goods: Concrete; reinforcement; concrete forms; construction material; construction equipment
Duration of project: 14 months
Used machinery: 2 carriages SFM 30/60, 1 winch HSW 100/160