Rio Wele Bridge Project.

Project description

The climatic conditions during the Rio Wele project in Equatorial Guiniea were challenging – the extremely high air humidity during the installation of the cable crane made it being a hard work for our Team which installed the cable crane during the rain the rain period.

Scope of work

Cable crane for Highway Bridge; transport of concrete and construction material as well as all necessary construction machinery.

Project Info

Customer: Besix G.E.
Project Owner: Government of Equatorial Guinea
Location: Equatorial Guinea
Date: 2011-2012

Technical details

Number of cranes: 1 span with 300 m
Total length: : 1 span with 300 m
Towers: 2
Payload: 9 to
Transported goods: Concrete; reinforcement; concrete forms; construction material; construction equipment
Duration of project: 14 months
Used machinery: 2 carriages SFM 30/60, 1 winch HSW 100/160

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects