Sochi – Ski Resort.

Project description

In a short-term period, three complete cable-crane systems were delivered and installed in Krasnaja Poljana, the ski resort next to Sochi. They were used for the installation of new ski-lifts that where built for the Winter Olympics 2014 in Sochi.

Scope of work

Cable cranes for construction of ski lifts for the Olympic Games in Sochi 2014

Project Info

Customer: Rosengineering Procurement
Location: Russia
Date: 2011 – 2012

Technical details

Number of cranes: 3
Total length: approx. 2.000 per crane installation (totally: approx. 6.000 m)
Towers: 7-8 / Installation (totally: >20)
Payload: 6 to
Transported goods: steel structures for ski lift towers, construction equipment, ski lift parts, concrete
Duration of project: 16 months
Slope: up to 67°
Machinery in usage: 3 carriages GANTNER GC 50, 2 winches GANTNER HSW 130 / 260, 1 winch GANTNER GW 350 D

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects