Uran Chakan Pipeline Project.

Project description

The Uran Chakan Pipeline is running over a very steep section in Eastern India. The section to overcome had a length of approx. 1,100 m and is characterized by very rocky surface. To overcome the terrain, LCS installed two cable crane systems with a payload of  5 tons each. The cable cranes as transport and pipe-laying solution made it possible to lay the pipeline in an area with strong environmental restrictions, with an ROW of 8 m maximum.

Scope of work

Installation of a cable crane for the construction of a gas-pipeline.

Project Info

Customer: Kalpataru
Project Owner: HIndustan Petroleum Corporation
Location: India
Date: 2015 – 2016

Technical details

Number of installations: 2
Total length: 1.100 m (500 + 600 m)
Towers: 3
Payload: 5 to
Transported goods: pipes, padding material, sandbags, machinery
Duration of project: current project
slope: >60°
Pipes: 16″
Used machinery: carriage SFM 30/60, winch GANTNER GW350D

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects