Los Ramones Pipeline Construction.

Project description

The Pipeline Los Ramones is built by a consortium of three companies. LCS Cable Cranes contributed to the construction of phase II in NorthEast Mexico. This Natural gas pipeline is through challenging terrain and crossing a mountain range with a very steep section at the peak of the mountain. LCS Cable Cranes provided a cable crane system with a payload of 8 tons to transport and lay pipes. For this project, LCS only had a very short mobilization time in order to organize the material, shipment and installation of the complete cable crane system.

Scope of work

Installation of a cable crane for the construction of a gas-pipeline.

Project Info

Customer: AOT Pipelines (Arendal, Odebrecht & Techint)
Location: Mexico
Year: 2015

Technical details

Number of installations: 1
Total length: 600 m
Towers: 2
Payload: 8 to
Transported goods: pipes, padding material, sandbags, machinery
Duration of project: 3 months
Slope: >38°
Pipes: 42″
Used machinery: carriage GSK80, winch GANTNER GW500D

Project Gallery

Why cable cranes?

Discover the numerous advantages of cable crane systems!

LONGTIME EXPERIENCE IN DEVELOPING AND EXECUTING TRANSPORTATION PROJECTS.

LCS Cable Cranes has been carrying out many challenging projects all over the world addressing new challenges and geographical and meteorological circumstances and could always meet them to the fullest customer satisfaction.
Our cable crane systems have been used for a large construction variety.

Visit a selection of our successful projects